calculationPeriodDatesReference | CalculationPeriodDatesReference | A pointer style reference to the associated calculation period dates component defined
elsewhere in the document.
| Calculation period dates reference. | | 0-1,
ncf | At the first stage the repository doesn't use relative dates. |
initialStub | StubValue | Specifies how the initial stub amount is calculated. A single floating rate tenor
different to that used for the regular part of the calculation periods schedule may
be specified, or two floating tenors may be specified. If two floating rate tenors
are specified then Linear Interpolation (in accordance with the 2000 ISDA Definitions,
Section 8.3. Interpolation) is assumed to apply. Alternatively, an actual known stub
rate or stub amount may be specified.
| Initial stub calculation period. | | 0-1 | |
finalStub | StubValue | Specifies how the final stub amount is calculated. A single floating rate tenor different
to that used for the regular part of the calculation periods schedule may be specified,
or two floating tenors may be specified. If two floating rate tenors are specified
then Linear Interpolation (in accordance with the 2000 ISDA Definitions, Section 8.3.
Interpolation) is assumed to apply. Alternatively, an actual known stub rate or stub
amount may be specified.
| Final stub calculation period. | | 0-1 | |